A nation of 51.4 million whose electricity is almost entirely renewable, that commissioned
the 600 megawatt Karuma dam in 2024, and where nearly half of citizens are not yet
connected.

Perfect Nations values what Uganda owns and raises capital against it, through **
innovative financing for development (FfD)** and **super intelligence (SI)**.

Uganda at a glance

 * **51.4m**PeopleWorld Bank, 2025
 * _Furthest from reach · Energy_**~50m**Ugandans who cook without clean fuel or
   technology[World Bank, 2024](https://data.worldbank.org/indicator/EG.CFT.ACCS.ZS?locations=UG)
 * **25**Instruments and investments on record[Capital already committed](https://perfectnations.com/blueprints/uganda/#bp-register)

[Work with us](https://perfectnations.com/blueprints/uganda/#bp-studio)[Read the Letter to Uganda](https://perfectnations.com/blueprints/uganda/#bp-letter)

What we do for Uganda

## Assets. Capital. Solutions.

Perfect Nations is a new-age sovereign advisory firm, and its clients are nations.

 1. [01AssetsThe cupFive sovereign assets, valued, from The Nile to The People.](https://perfectnations.com/blueprints/uganda/#bp-assets)
 2. [02CapitalThe laurels25 instruments and investments on record, every one sourced.](https://perfectnations.com/blueprints/uganda/#bp-capital)
 3. [03SolutionsThe seven starsSeven basic standards of living, star by star. Energy is furthest from reach today.](https://perfectnations.com/blueprints/uganda/#bp-pc)

**The whole logo:** a Perfect Nation, where every citizen has all seven basic standards
of living, led by good governance.

[01](https://perfectnations.com/blueprints/uganda/#bp-do)**Assets** · The cup · 
Sovereign Assets

## Five assets no balance sheet counts.

Each is owned today, earns today, and can carry Uganda toward seven basic standards
of living for every citizen.

 * **600 MW**Karuma hydropower, commissioned September 2024
 * 
   ### The Nile
   
 * Financed 15% by the government and 85% by the Export-Import Bank of China.
 * **100%**Of electricity from renewables, 2023
 * 
   ### The Clean Grid
   
 * Clean power, reaching 55.3% of citizens.
 * **80.3%**Of land in agriculture, 2024
 * 
   ### The Land
   
 * Coffee, bananas and maize across four-fifths of the country.
 * **7.5%**Natural resource rents, share of GDP, 2021
 * 
   ### The Ground
   
 * Oil under development in the Albertine Rift, and minerals.
 * **51.4m**Citizens, 2025
 * 
   ### The People
   
 * One of the youngest populations on Earth. Remittances equal 4.5% of GDP.

[Every figure, with its source](https://perfectnations.com/blueprints/uganda/#bp-sources)
[The Sovereign Assets ledger](https://perfectnations.com/sovereign-assets/)

[02](https://perfectnations.com/blueprints/uganda/#bp-do)**Capital** · The laurels·
Capital Architecture

## 25 instruments. A railway from Malaba to Kampala, power to the last mile, and health, schools, farms and cities.

Bonds, guarantees, swaps and loans that raise capital against what Uganda owns, 
every line sourced.

[Capital Architecture](https://perfectnations.com/capital-architecture/)

The record in figures

 * **$37.12B**Total public debt stock at the end of June 2026, up from $32.30 billion
   a year earlier: domestic debt $20.82 billion and external debt $16.30 billion,
   54.3% of GDP in nominal terms[Ministry of Finance, 2026](https://finance.go.ug/sites/default/files/reports/Debt%20Statistical%20Bulletin%20June%202026.pdf)
 * **€650.75M**Islamic Development Bank financing approved in June 2026 for the 
   Malaba–Kampala Standard Gauge Railway, the largest amount its Board has approved
   for a single project in Uganda[Ministry of Finance, 2026](https://finance.go.ug/node/870)
 * **$1.7B**United States health support of approximately $1.7 billion for 2026 
   to 2030, under a Strategic Objective Agreement signed in September 2026; the 
   United States intends to channel it through government systems as budget support
   [Ministry of Finance, 2026](https://finance.go.ug/node/940)
 * **$4B**Existing World Bank Group portfolio in Uganda, as the Group launched a
   ten-year strategy for 2026 to 2035 and anticipates an indicative lending programme
   of about $2 billion per IDA three-year cycle[World Bank, 2026](https://www.worldbank.org/en/news/press-release/2026/06/04/world-bank-group-launches-ten-year-strategy-to-drive-jobs-and-prosperity-in-uganda)
 * **$568M**Electricity Access Scale-up Project: IDA financing for the last mile,
   with 1,073,500 grid connections in the indicative investment plan[World Bank, 2022](https://documents1.worldbank.org/curated/en/300941649085309748/pdf/Uganda-Electricity-Access-Scale-up-Project.pdf)

Capital already committed

 * GovernmentCompletedKaruma Hydropower Plant600 MW
 * Commissioned 26 September 2024 · Built by Sinohydro
 * Financed 15% by the Government of Uganda and 85% by the Export-Import Bank of
   China
 * A 600 MW hydropower plant in Kiryandongo District, built by Sinohydro, which 
   the chair of the Karuma and Isimba Hydropower Project Steering Committee called“
   Africa’s largest underground hydropower plant” at its commissioning. It serves
   the energy standard.
 * Government of UgandaExport-Import Bank of China
 * [Source](https://statehouse.go.ug/president-museveni-commissions-600mw-karuma-hydropower-plant-paving-the-way-for-ugandas-energy-and-economic-growth/)
 * MultilateralApprovedUganda–Tanzania Interconnector Project (UTIP)$250M
 * Approved, announced 18 June 2026 · IDA · First phase of the $1.6 billion RETRADE-
   EA programme · About 260 km of 400 kV double-circuit line
 * 1,000 MW of transfer capacity between Uganda and Tanzania
 * A new high-voltage line from Wobulenzi to Masaka and Mutukula, on the border 
   with Tanzania, that links Uganda to the regional grid so that surplus hydropower
   can be sold. The World Bank expects at least 452 gigawatt-hours a year to be 
   traded between Uganda and Tanzania by 2031 (a projection). It serves the energy
   and livelihood standards.
 * World Bank
 * [Source](https://www.worldbank.org/en/news/press-release/2026/06/18/eastern-africa-set-to-gain-more-reliable-affordable-power-with-world-bank-group-support)
 * MultilateralApprovedUganda Cities and Municipalities Infrastructure Development(
   UCMID)$540M
 * Approved, announced 31 March 2026 · IDA · Program-for-Results · Six years
 * 5.6 million people, among them 600,000 refugees
 * Results-based financing for climate-smart urban infrastructure in 10 cities, 
   26 municipalities and 13 refugee-hosting districts, succeeding the USMID programme
   that closed in 2024. At least 40,000 direct jobs are expected, 20,000 of them
   permanent. It serves the shelter and livelihood standards.
 * World Bank
 * [Source](https://www.worldbank.org/en/news/press-release/2026/03/31/world-bank-supports-uganda-s-cities-and-municipalities-to-build-climate-smart-infrastructure-and-create-jobs)
 * MultilateralApprovedStrengthening Public Investment and Asset Management for 
   Growth and Resilience (PIM Plus)$200M
 * Approved 3 September 2025 · IDA · Borrowing approved by Parliament 29 October
   2025
 * Public investment and asset management
 * Strengthens government efficiency, accountability and the sustainability of public
   investment and asset management. It serves all seven standards through better
   public investment.
 * World Bank
 * [Source](https://documents1.worldbank.org/curated/en/099617106092693627/pdf/SECBOS-efe47dfe-299a-410b-8431-8f55e6a22868.pdf)
 * MultilateralApprovedUganda Learning Acceleration Program (ULEARN)$210M
 * Approved 4 June 2025 · IDA · Borrowing approved by Parliament 29 October 2025
 * Learning environments in target schools
 * Aims to improve learning environments in target schools. It serves the education
   standard, where 18.1% of children read a simple text by the end of primary school(
   World Bank, 2014).
 * World Bank
 * [Source](https://documents1.worldbank.org/curated/en/099617106092693627/pdf/SECBOS-efe47dfe-299a-410b-8431-8f55e6a22868.pdf)
 * MultilateralApprovedDevelopment Response to Displacement Impacts Project, Phase
   II (DRDIP II)$328M
 * Approved 4 June 2025 · IDA · Parliament approved borrowing of $180.5 million 
   for it on 29 October 2025
 * Refugees and host communities
 * The second phase of the Development Response to Displacement Impacts Project,
   which seeks to expand economic opportunities for host communities and refugees.
   It serves the livelihood standard.
 * World Bank
 * [Source](https://documents1.worldbank.org/curated/en/099617106092693627/pdf/SECBOS-efe47dfe-299a-410b-8431-8f55e6a22868.pdf)
 * MultilateralApprovedNorthern Uganda Social Action Fund IV (NUSAF IV)$250M
 * Approved 1 April 2025 · IDA · Five years · Borrowing approved by Parliament 29
   October 2025
 * Over three million beneficiaries expected
 * The fourth Northern Uganda Social Action Fund, which strengthens adaptive social
   protection systems in sub-regions that include West Nile, Acholi, Lango, Teso
   and Karamoja. It serves the food and livelihood standards.
 * World Bank
 * [Source](https://documents1.worldbank.org/curated/en/099617106092693627/pdf/SECBOS-efe47dfe-299a-410b-8431-8f55e6a22868.pdf)
 * MultilateralApprovedUganda Climate Smart Agricultural Transformation Project$
   350M
 * Approved 22 December 2022 · IDA credit $325 million and IDA grant $25 million·
   Investment Project Financing · Expected closing 31 December 2028
 * About 760,000 households, 3.9 million people, to benefit directly
 * Climate-smart agriculture for smallholder farmers in 69 districts, seven of them
   refugee-hosting, run by the Ministry of Agriculture, Animal Industry and Fisheries
   over six years. It serves the food and livelihood standards.
 * World Bank
 * [Source](https://documents1.worldbank.org/curated/en/099050012052240654/pdf/BOSIB05e6fc47e0770aeec00ad5e11774f2.pdf)
 * MultilateralApprovedGenerating Growth Opportunities and Productivity for Women
   Enterprises (GROW)$217M
 * Approved 17 June 2022 · IDA grant, SDR 161.5 million · Investment Project Financing·
   Expected closing 31 December 2027
 * Women’s businesses, including refugees and women in host communities
 * Finance and business support for women entrepreneurs, including refugees and 
   women entrepreneurs from host communities. It serves the livelihood standard.
 * World Bank
 * [Source](https://documents1.worldbank.org/curated/en/527091655323259747/pdf/Uganda-Generating-Growth-Opportunities-and-Productivity-for-Women-Enterprises-Uganda-Project.pdf)
 * MultilateralApprovedGreater Kampala Metropolitan Area Urban Development Program
   $566M
 * Approved 31 May 2022 · IDA credit $518 million and IDA grant $48 million · Program-
   for-Results · Closing 31 December 2027 · Borrowing approved by Parliament 23 
   August 2023
 * With $571.31 million of counterpart funding, a $1.14 billion programme
 * Results-based financing for roads, infrastructure and services in Kampala and
   eight surrounding local governments, through the Ministry for Kampala Capital
   City and Metropolitan Affairs. It serves the shelter and livelihood standards.
 * World Bank
 * [Source](https://documents1.worldbank.org/curated/en/217181652392646709/pdf/Uganda-Greater-Kampala-Metropolitan-Area-Urban-Development-Program-Program-for-Results.pdf)
 * MultilateralApprovedElectricity Access Scale-up Project (EASP)$568M
 * Approved 31 March 2022 · IDA credit $331.5 million and IDA grant $236.5 million·
   Expected closing 30 June 2027
 * Plus $30 million from the Clean Technology Fund and $10 million from ESMAP; total
   financing $638 million
 * IDA financing for last-mile grid connections, with 1,073,500 connections in the
   indicative investment plan. It serves the energy standard.
 * World Bank
 * [Source](https://documents1.worldbank.org/curated/en/300941649085309748/pdf/Uganda-Electricity-Access-Scale-up-Project.pdf)
 * MultilateralExpiredExtended Credit Facility$1B
 * Approved 28 June 2021 · SDR 722 million, 200 percent of quota · Fifth review 
   completed 6 March 2024 · “the expiration of the 2021–24 Extended Credit Facility
   arrangement” (IMF, July 2026)
 * About $870 million (SDR 631.75 million) disbursed by March 2024
 * IMF lending of about $1 billion under the 2021–24 arrangement, of which about
   $870 million was disbursed by March 2024. Since the arrangement expired, the 
   IMF Executive Board has concluded a Post-Financing Assessment, on 12 January 
   2026, and the 2026 Article IV consultation, in July 2026.
 * International Monetary Fund
 * [Source](https://www.imf.org/en/News/Articles/2024/03/06/pr-2472-uganda-imf-completes-fifth-review-under-the-extended-credit-facility-arrangement)
 * MultilateralApprovedUganda Secondary Education Expansion Project$150M
 * Approved 23 July 2020 · IDA credit $90 million and IDA grant $60 million
 * Lower secondary schooling for underserved areas
 * Enhances access to lower secondary education, focusing on underserved populations
   in targeted areas. It serves the education standard.
 * World Bank
 * [Source](https://www.worldbank.org/en/news/loans-credits/2020/07/23/uganda-secondary-education-expansion-project)
 * MultilateralApprovedIrrigation for Climate Resilience Project$169.2M
 * Approved 18 June 2020 · IDA credit, SDR 122.9 million · Investment Project Financing·
   Expected closing at appraisal 30 April 2026
 * 63,200 farmers as primary beneficiaries
 * Gives farmers in the project areas access to irrigation and other agricultural
   services. It serves the food and livelihood standards.
 * World Bank
 * [Source](https://documents1.worldbank.org/curated/en/860371591125380263/pdf/Uganda-Irrigation-for-Climate-Resilience-Project.pdf)
 * MultilateralApprovedIntegrated Water Management and Development Project$345M
 * Approved 14 June 2018 · IDA credit $251 million and IDA grant $29 million at 
   approval · Revised closing date of 31 January 2026 proposed in a 2024 restructuring
   paper
 * Total commitment in the World Bank Group’s 2026 portfolio snapshot; $280 million
   at approval, with $25 million of parallel KfW financing
 * Water supply and sanitation services, integrated water resources management and
   the operational performance of service providers, including new coverage for 
   refugees and host communities. It serves the water and shelter standards.
 * World Bank
 * [Source](https://documents1.worldbank.org/curated/en/099617106092693627/pdf/SECBOS-efe47dfe-299a-410b-8431-8f55e6a22868.pdf)
 * RegionalApprovedUganda Airports Development Programme, Phase 1: Arua Airport€
   155.99M
 * Approved, announced 18 June 2026 · AfDB loan €141.15 million and ADF loan €14.84
   million · Total cost €157.76 million
 * A 3.5-kilometre runway able to take a Boeing 777
 * African Development Bank Group financing to upgrade Arua Airport, with a 3.5-
   kilometre paved runway, a passenger terminal for 700,000 travellers a year and
   a cargo terminal for 25,000 tonnes a year. It serves the livelihood standard 
   through regional trade and tourism.
 * African Development BankAfrican Development Fund
 * [Source](https://allafrica.com/stories/202606180620.html)
 * RegionalApprovedStandard Gauge Railway (Malaba–Kampala) Project€650.75M
 * Approved June 2026 by the 367th meeting of the IsDB Board of Executive Directors,
   Baku · Release of 16 June 2026 · Financial close targeted by the Government for
   November 2026
 * The largest amount the IsDB Board has approved for a single project in Uganda,
   according to the Ministry of Finance
 * Islamic Development Bank financing to build the Malaba–Kampala standard gauge
   railway, including, according to the Ministry of Finance, the 553-metre Jinja
   Nile Bridge, the 2.12-kilometre Mbuya–Kampala tunnel, six stations and three 
   workshops. The IsDB expects lower transport costs and travel times and about 
   3,000 jobs; it serves the livelihood and food standards.
 * Islamic Development Bank
 * [Source](https://www.isdb.org/news/isdb-board-of-executive-directors-approves-us-28-billion-in-major-development-financing-at-2026-isdb-group-annual-meetings-in-baku)
 * RegionalApprovedUganda Multipurpose Water for Climate Resilient Irrigation Development
   and Agro-Industrialization Programme$140M
 * Approved, announced 12 June 2026 · African Development Fund loan · Total cost
   $207 million, with the OPEC Fund, the Government of Uganda and others
 * More than 4,000 hectares at first, with potential to reach 13,000
 * An African Development Fund loan for water-transfer infrastructure and irrigation
   networks, expected to create more than 13,000 direct jobs and reach more than
   121,000 households directly, and about 21,000 schoolchildren through school feeding.
   It serves the food, water and livelihood standards.
 * African Development BankAfrican Development FundOPEC Fund for International Development
 * [Source](https://fr.allafrica.com/stories/202606150816.html)
 * RegionalApprovedUganda Rural Electricity Access Project (UREAP), Phases I and
   II€93.91M
 * Approved 7 April 2026 · €7.33 million additional financing for Phase I · Phase
   II AfDB loan €86.58 million, with a €12.93 million loan and a €1.72 million grant
   from the Climate Investment Funds · Phase II total cost €104.39 million
 * 259,723 new grid and mini-grid connections over six years in Phase II
 * Phase II builds about 624 km of medium-voltage and 2,154 km of low-voltage lines
   to give first-time electricity to nearly 1.18 million people, including more 
   than 250,000 households and 3,000 businesses; the Phase I top-up completes compensation
   and outstanding works. It serves the energy standard.
 * African Development BankClimate Investment Funds
 * [Source](https://allafrica.com/stories/202604220738.html)
 * RegionalApprovedBusega–Mpigi Expressway, additional financing (Multinational 
   Busega–Mpigi and Kagitumba–Kayonza–Rusumo Roads Project)€217.37M
 * Approved, announced 6 November 2025 · ADB loan €188.18 million, ADF loan €28.31
   million and a $1 million NEPAD-IPPF grant · Government of Uganda €30.98 million
 * Uganda section now costed at €424.61 million, from €176.26 million
 * Completes the 27.3-kilometre Busega–Mpigi expressway on the Northern Corridor
   from Kampala to Kigali, with interchanges, seven new bridges, toll plazas and
   54 km of lined drainage. It serves the livelihood standard.
 * African Development BankAfrican Development Fund
 * [Source](https://allafrica.com/stories/202511070489.html)
 * RegionalApprovedUganda Biogas and Electric Cooking Project$8.79M
 * Approved, announced 7 May 2025 · Mainly from the African Development Fund’s Climate
   Action Window, 64% of the cost · Co-funded by the UK FCDO and the Government 
   of Uganda
 * About 77,000 electric cooking devices and 47 biogas plants
 * Builds 47 biogas plants for schools, markets and farming communities and provides
   about 77,000 affordable electric cooking devices in major urban centres, with
   standards, repair services and distribution for the appliances. It reaches clean
   cooking, which sets Uganda’s Coverage: 2% of Ugandans cook with clean fuels and
   technology.
 * African Development BankAfrican Development FundUK Foreign, Commonwealth and 
   Development Office
 * [Source](https://allafrica.com/stories/202505100067.html)
 * RegionalApprovedUganda–South Sudan Electricity Interconnection Project$119.21M
 * Approved 13 December 2024 by the ADF Board · ADF loan to Uganda · 299 km, 150
   km of it in Uganda · Total cost $260 million
 * Part of $153.66 million from the ADF, with a $32.5 million grant to South Sudan
 * An electricity interconnection from Gumbo, near Juba, to Olwiyo, with new 400/
   132/33 kV substations at Gumbo and at Biba on the border, and upgrades at the
   Karuma and Olwiyo substations. It links the grids of Uganda and South Sudan and
   serves the energy and livelihood standards.
 * African Development Fund
 * [Source](https://allafrica.com/stories/202502130660.html)
 * BilateralSignedUnited States–Uganda health cooperation: Strategic Objective Agreement
   $1.7B
 * Signed, announced 8 September 2026 · Implements the bilateral health MOU of 10
   December 2025 · 2026 to 2030 · The United States intends to channel the support
   through government systems as budget support
 * About Shs 6.42 trillion; under the MOU, Uganda pledges to raise its own health
   spending by $577 million
 * United States support of approximately $1.7 billion for the prevention, detection
   and response to emerging and existing infectious disease threats, in a shift 
   from mostly off-budget assistance to government-to-government financing. The 
   MOU’s priorities are outbreak response, reducing the burden of disease, strengthening
   frontline workers and data digitisation for accountability; it serves the health
   standard.
 * United States GovernmentGovernment of Uganda
 * [Source](https://finance.go.ug/node/940)
 * BilateralSignedProject for the Reconstruction of Karuma BridgeJPY 4.94B
 * Grant agreement signed 25 March 2025, Kampala · Japanese grant aid · 60 months,
   including detailed design and bidding · Executing agency: Ministry of Works and
   Transport
 * JPY 4,939 million
 * A JICA grant to rebuild the Karuma Bridge and its approach road on the main road
   between Kiryandongo and Nwoya districts, improving traffic flow and road safety
   on the northern corridor. It serves the livelihood standard.
 * JICA
 * [Source](https://www.jica.go.jp/english/information/press/2024/20250327_12.html)
 * PrivateSignedSupport Rural Livelihoods Uganda, loan for MSMEs (Stanbic Bank Uganda)
   €100M
 * Approved 15 May 2025 · Signed 31 July 2025 in two tranches of €25 million and
   €75 million · Credit facility for on-lending
 * €80 million for agricultural projects and €20 million for women borrowers
 * A European Investment Bank credit facility to Stanbic Bank Uganda for on-lending
   to micro, small and medium-sized enterprises and mid-caps, focused on sustainable
   agriculture, food security and women’s economic empowerment, jointly with the
   Gates Foundation. It serves the food and livelihood standards.
 * European Investment BankStanbic Bank Uganda
 * [Source](https://www.eib.org/en/projects/all/20230768)

### The Uganda Newswire

[The Solutions Wire](https://perfectnations.com/state-of-nations/#sn-wire)

![Daniel Okello, Nation Steward of Uganda](https://perfectnations.com/wp-content/
uploads/2026/10/daniel-okello-nation-steward-of-uganda-150x150.png)

**Daniel Okello**Nation Steward of Uganda · SI ResearcherLast updated 11 November
2026

 * 4 Nov 2026[**Germany commits over Shs230 billion to Uganda for development projects**](https://www.monitor.co.ug/uganda/news/national/germany-commits-over-shs230-billion-to-uganda-for-development-projects-5658464)
   Daily Monitor
 * 16 Oct 2026[**Govt seeks new IMF programme to unlock cheap financing**](https://www.monitor.co.ug/uganda/news/national/govt-seeks-new-imf-programme-to-unlock-cheap-financing-5635124)
   Daily Monitor
 * 3 Sep 2026[**Uganda, US sign Shs6.4 trillion health financing agreement**](https://nilepost.co.ug/news/368747/uganda-us-sign-shs64-trillion-health-financing-agreement)
   Nile Post
 * 20 Jun 2026[**Uganda’s SGR gets green light with largest-ever Shs2.6 trillion Islamic Development Bank financing package**](https://www.monitor.co.ug/uganda/news/national/uganda-s-sgr-gets-green-light-with-largest-ever-shs2-6-trillion-islamic-development-bank-financing-package-5503366)
   Monitor
 * 12 Jun 2026[**Uganda - African Development Bank Group Approves $140 Million Programme to Expand Irrigation, Agro-Industrialisation, Jobs and Rural Incomes**](https://allafrica.com/stories/202606150818.html)
   African Development Bank via allAfrica

## Already working in Uganda.

Independent firms and social enterprises already at work in Uganda, highlighted 
by Perfect Nations. None is a partner of Perfect Nations.

[Suggest an enterprise](https://perfectnations.com/blueprints/uganda/contact@perfectnations.com?subject=An%20enterprise%20already%20at%20work%20in%20Uganda)

 * Food
 * 
   ### Pearl Dairy
   
 * Established in Uganda in 2009, it makes UHT and powder milks, flavoured milks,
   yoghurts, butter and honey. In 2023 IFC approved up to $8.75 million, a concessional
   subordinated loan under the GAFSP Private Sector Window, alongside a loan package
   of up to $35 million from IFC and FMO, for capacity expansion that includes its
   powder milk plant in Uganda.
 * [IFC, 2023](https://disclosures.ifc.org/project-detail/SII/47227/pearl-dairy-ivm)
 * Water
 * 
   ### Water Mission Uganda
   
 * Has worked in Uganda since 2007 and serves nearly 1.1 million people through 
   community-based piped water systems, emergency water treatment, latrines, handwashing
   stations and school washrooms. It works with UNHCR in refugee settlements, in
   the West Nile (Yumbe, Terego, Madi Okolo) and in the East Nile (Luuka, Buyende).
 * [Water Mission](https://watermission.org/about/offices/uganda)
 * Shelter
 * 
   ### Housing Finance Bank
   
 * A partner of AFD since 2011, it rolls out housing microfinance through its 19
   branches across Uganda. In 2020 it signed a €10 million AFD line of credit to
   deploy its housing microfinance and affordable housing offer to low- and middle-
   income households who do not have access to an adequate financial offer.
 * [AFD, 2020](https://www.afd.fr/en/actualites/communique-de-presse/hfb-and-afd-sign-eu105-million-agreement-towards-affordable-housing-uganda)
 * Energy
 * 
   ### Fenix International, an ENGIE company
   
 * Sells solar home systems in Uganda under pay-as-you-go contracts. In 2020 the
   EIB lent it $12.5 million to roll out 240,000 solar home systems, so that over
   a million people across Uganda could have electricity for the first time.
 * [EIB, 2020](https://eib.org/press/all/2020-207-14-million-ugandans-to-access-reliable-and-affordable-energy-under-new-eib-engie-initiative)
 * Education
 * 
   ### Educate!
   
 * Launched its flagship in-school model, the Educate! Experience, in Uganda in 
   2009. It gives secondary students leadership, entrepreneurship and workforce 
   readiness training, with mentorship, to start real businesses at school.
 * [Educate!](https://www.experienceeducate.org/wherewework)
 * Health
 * 
   ### Living Goods
   
 * Began its community health programme in Uganda in 2007 and supports over 2,400
   community health workers, known locally as Village Health Teams, reaching 1.4
   million Ugandans with essential health care. The Ministry of Health chose it 
   to lead the digital eCHIS rollout in six districts, completed in late 2023.
 * [Living Goods](https://livinggoods.org/where-we-work/uganda/)
 * Livelihood
 * 
   ### Centenary Bank
   
 * Lends to micro-enterprises under a €50 million EIB Global credit line, part of
   a €100 million programme signed in 2024. In the first year more than 24,000 micro-
   enterprises received financing, over 60% of the beneficiaries were women and 
   75% of the projects were in rural areas.
 * [EIB, 2026](https://www.eib.org/en/press/all/2026-270-over-24000-ugandan-micro-businesses-receive-financing-from-eib-global-in-partnership-with-centenary-bank)

[03](https://perfectnations.com/blueprints/uganda/#bp-do)**Solutions** · The seven
stars · Perfect Capita

## Perfect Uganda, _star by star._

**Perfect Capita** is the yearly cost, per person, of lifting everyone above the
Living Line in all seven basic living standards, set with Uganda in its own prices.

[How Perfect Capita works](https://perfectnations.com/perfect-capita/)

**2**

Energy · furthest from reach2% cook with clean fuels and technology[World Bank, 2024](https://data.worldbank.org/indicator/EG.CFT.ACCS.ZS?locations=UG)

Tap a star for its figure and source.

The price of Perfect Uganda

To be set with Uganda, from its own figures and in its own prices: Perfect Capita
times the people of Uganda, each year.

Read more

 * Food**48.4%**Not food insecure; 51.6% are moderately or severely food insecure
   [FAO, 2024](https://data.worldbank.org/indicator/SN.ITK.MSFI.ZS?locations=UG)
 * Water**18.1%**Safely managed drinking water[WHO/UNICEF, 2024](https://data.worldbank.org/indicator/SH.H2O.SMDW.ZS?locations=UG)
 * Shelter**20.4%**Safely managed sanitation[WHO/UNICEF, 2024](https://data.worldbank.org/indicator/SH.STA.SMSS.ZS?locations=UG)
 * Energy**2**2% cook with clean fuels and technology[World Bank, 2024](https://data.worldbank.org/indicator/EG.CFT.ACCS.ZS?locations=UG)
 * Education**18.1**18.1% of children read a simple text by the end of primary school;
   2014, dated[World Bank, 2014](https://data.worldbank.org/indicator/SE.LPV.PRIM?locations=UG)
 * Health**54**WHO service coverage index[WHO, 2023](https://ourworldindata.org/grapher/universal-health-coverage-index?country=~UGA)
 * Livelihood**45.6%**Above US$3.00 a day; 54.4% live below it[World Bank, 2023](https://data.worldbank.org/indicator/SI.POV.DDAY?locations=UG)

Perfect Nations estimate, to be confirmed with Uganda. Figures marked dated rest
on surveys more than five years old; lenient measures are marked as such. [The strict measures](https://perfectnations.com/perfect-capita/#pq-measures)

Strict measures. Food: share not moderately or severely food insecure (FAO). Water:
safely managed drinking water where measured; where it is not, basic water, marked
as such. Shelter: the lower of safely managed sanitation and the share outside urban
slums. Energy: the lower of electricity per person against 1,000 kWh and clean cooking.
Education: the lower of children reading by the end of primary school and lower-
secondary completion. Health: WHO service coverage index. Livelihood: share above
the stricter of the national poverty line and the World Bank line for the nation’s
income group. Each figure links to its source.

### Solutions for Perfect Uganda

[All Solutions](https://perfectnations.com/state-of-nations/#sn-solutions)

 * **Solution No. 34**9 Nov 2026
 * 
   ### 󠀁[Cook-as-You-Go](https://perfectnations.com/state-of-nations/#solution-34)󠁿
   
 * Clean power from the Nile comes with a clean kitchen, financed by carbon credits.
    - **01****The challenge**About 50 million Ugandans, almost everyone, cook without
      clean fuel or technology.
    - **02****What Perfect Nations advises**Uganda should let households cook with
      its clean hydropower on cook-as-you-go plans, financed by carbon credits and
      the Electricity Access Scale-up Project, so every new connection comes with
      a clean kitchen. With super intelligence, smart meters can verify each meal
      cooked with electricity, turning every verified switch into a carbon credit
      that finances the next home.
 * **~50m**Ugandans who cook without clean fuel
 * From**Preeti Sinha**President and CEO, Perfect Nations[Read the Solution](https://perfectnations.com/state-of-nations/#solution-34)
   [Discuss this Solution](https://perfectnations.com/contact/?about=solution-34&country=Uganda)

![Uganda in Bloom, nation portrait of Uganda](https://perfectnations.com/wp-content/
uploads/2026/10/pn-portrait-uganda-768x768.png)

Uganda in BloomNation Portrait · [Art of Nations](https://perfectnations.com/art-of-nations/)

Perfect Nations® · Letters to the NationsUganda

## Dear Uganda,

The Nile begins its journey to the Mediterranean in your country, and you have harnessed
it. … The river is harnessed. The power has yet to reach nearly half of you.

“The Nile already lights your grid. Let it light every home and clinic along its
banks.”

Yours in design,**Preeti Sinha**President and CEO, Perfect Nations[Read the full letter](https://perfectnations.com/dear-uganda/)

Work with us · The ReDesign Studio

## The Perfect Uganda _ReDesign Studio_

One mission, three depths: the same four moves for Uganda, taken as far toward market
as you choose.

Read more

For the Government of Uganda, its development partners and investors. Scope and 
fees are agreed in writing before any work begins.

 1. **01**Identify the assets
 2. **02**Estimate Perfect Capita
 3. **03**Co-design the capital architecture
 4. **04**Launch the instruments

 1.  Mandate 013 hours
 2.  
     ### The Nation Briefing
     
 3.  A private session for the people who decide.
 4.  You leave withThe gap, named and sized
 5.  Read more
 6.   a. **01**The five sovereign assets on this page, walked through.
      b. **02**Coverage of 2 and the Gap, explained.
      c. **03**The instruments that could close the Gap, shortlisted.
      d. **04**The path to market, outlined.
 7.  [Request a Nation Briefing](https://perfectnations.com/contact/?about=briefing&country=Uganda)
 8.  Mandate 023 days
 9.  
     ### The Blueprint Lab
     
 10. Your team and ours, working the blueprint together.
 11. You leave withThe structure, drawn
 12. Read more
 13.  a. **01**The ledger tested against your ministries’ own data.
      b. **02**Each of the seven standards costed in Ugandan prices.
      c. **03**One financing structure, drawn with your team.
      d. **04**A term sheet and the partners to approach.
 14. [Plan a Blueprint Lab](https://perfectnations.com/contact/?about=lab&country=Uganda)
 15. Mandate 03End to end
 16. 
     ### The Sovereign Mandate
     
 17. Led personally by the President and CEO.
 18. You leave withA structure ready for market
 19. Read more
 20.  a. **01**A full sovereign asset ledger, valued and verified.
      b. **02**Perfect Capita set and agreed with government, with a monitoring plan.
      c. **03**The full structure: legal form, credit enhancement, guarantees and pricing.
      d. **04**Taken to investors and development partners, through to close.
 21. [Discuss a Sovereign Mandate](https://perfectnations.com/contact/?about=commission&country=Uganda)

### Co-design it with us

Where Ugandans and Co-designers design the nation they want to live in.

 * Writings
 * 
   #### Write Perfect Uganda into being.
   
 * Up to 1,500 words on your vision of Perfect Uganda, published with your name.
 * [Submit your writing](https://perfectnations.com/blueprints/uganda/contact@perfectnations.com?subject=Writing%20for%20Perfect%20Uganda&body=Your%20name%2C%20or%20a%20pen%20name%3A%0D%0AWhere%20you%20live%3A%0D%0ATitle%3A%0D%0A%0D%0AYour%20vision%20of%20Perfect%20Uganda%2C%20and%20the%20economic%20solutions%20to%20achieve%20it%20%28up%20to%201%2C500%20words%29%3A%0D%0A%0D%0A%0D%0AI%20confirm%20that%20this%20is%20my%20own%20original%20writing%2C%20and%20I%20give%20Perfect%20Nations%20permission%20to%20publish%20it%20with%20credit%20to%20me.%0D%0A)
 * Voices of Perfect Nations Launching soon
 * 
   #### The local leaders already building Perfect Uganda.
   
 * Great local leaders: honest, dedicated and committed to basic standards of living
   for all. Every guest answers one question: “What does Uganda already own, and
   how could it pay for a decent life for every citizen?”
 * [Nominate yourself](https://perfectnations.com/contact/?nation=uganda&topic=nominate-self)
   [Suggest a guest](https://perfectnations.com/contact/?nation=uganda&topic=guest)
 * Co-designers
 * 
   #### Join the community.
   
 * Everyone who shares a vision, a voice or an enterprise here becomes a **Co-designer
   of Perfect Uganda**.
 * [Become a Co-designer](https://perfectnations.com/blueprints/uganda/contact@perfectnations.com?subject=Becoming%20a%20Co-designer%20of%20Perfect%20Uganda&body=Your%20name%3A%0D%0AWhere%20you%20live%3A%0D%0AHow%20you%20would%20like%20to%20contribute%20%28writing%2C%20a%20voice%20for%20the%20podcast%2C%20an%20enterprise%2C%20your%20expertise%29%3A%0D%0A)

The Uganda ReDesign Studio is open

## Design Perfect Uganda with us.

Share your vision, suggest a guest, or write to us: every message receives a personal
reply.

[Enter the ReDesign Studio](https://perfectnations.com/design-studio/)[Write to us](https://perfectnations.com/contact/?nation=uganda)
[All 195 nations](https://perfectnations.com/blueprints/)

Sources

 1. World Bank, World Development Indicators, accessed 12 October 2026: population 
    2025, urban share 2025, land in agriculture and forest 2024, electricity access
    2024, renewable fresh water per person 2022, natural resource rents, renewable 
    share of electricity output 2021.
 2. WHO UHC service coverage index, 2023 (WHO Global Health Observatory). WHO/UNICEF
    JMP basic drinking water (via World Bank). FAO prevalence of undernourishment (
    via World Bank). UN-Habitat urban slum share, 2022 (via World Bank). National poverty
    headcount, latest survey (via World Bank).
 3. State House Uganda, 26 September 2024: Karuma Hydropower Plant, 600 MW; financed
    15% by the Government of Uganda and 85% by the Export-Import Bank of China.
 4. World Bank project pages for each entry of Capital already committed, as linked.
    The World Bank projects database lists few approvals after 2024; newer operations
    may be missing.

![Uganda in Bloom, flag edition: the nation portrait of Uganda painted with its 
flag](https://perfectnations.com/wp-content/uploads/2026/11/pn-portrait-flag-uganda-
768x768.png)

Uganda in BloomNation Portrait, flag edition · [Art of Nations](https://perfectnations.com/art-of-nations/)