National Blueprint · One of 195

Eswatini

A nation of 1.26 million that reached the 95-95-95 HIV treatment targets a decade early, and where more than half of citizens still live below the poverty line.

Perfect Nations values what Eswatini owns and raises capital against it, through innovative financing for development (FfD) and super intelligence (SI).

Eswatini at a glance

What we do for Eswatini

Assets. Capital. Solutions.

Perfect Nations is a new-age sovereign advisory firm, and its clients are nations.

  1. 01AssetsThe cupFive sovereign assets, valued, from The Health System to The People.
  2. 02CapitalThe laurels13 instruments and investments on record, every one sourced.
  3. 03SolutionsThe seven starsSeven basic standards of living, star by star. Water is furthest from reach today.

The whole logo: a Perfect Nation, where every citizen has all seven basic standards of living, led by good governance.

01Assets · The cup · Sovereign Assets

Five assets no balance sheet counts.

Each is owned today, earns today, and can carry Eswatini toward seven basic standards of living for every citizen.

  • 95-95-95HIV targets met, a decade early

    The Health System

    94% know their status, 97% of them are on treatment, 96% of those are virally suppressed.

  • 83.1%Renewable share of electricity output, 2021

    The Clean Power

    And 89.3% of citizens connected, among the highest in the region.

  • 69.6%Of land in agriculture, 2024

    The Land

    Sugar cane and farms across most of the country, while half of citizens are poor.

  • 25.3%Of land under forest, 2024

    The Forest

    Woodland and plantations across a quarter of the kingdom.

  • 1.26mCitizens, 2025

    The People

    Three in four live in the countryside.

02Capital · The laurels · Capital Architecture

13 instruments. Water, power, roads, schools and clinics, broadband, and budget support for private-sector growth.

Bonds, guarantees, swaps and loans that raise capital against what Eswatini owns, every line sourced.

Capital Architecture

The record in figures

  • $53MWater Supply and Sanitation Access Project: Rural water and sanitation, with $8m additional financing, June 2025World Bank
  • $40MNetwork Reinforcement and Access Project: Grid and new connectionsWorld Bank
  • $32.1MStrengthening Early Childhood Development and Basic Education Systems: Early years and basic schoolingWorld Bank
  • $20MHealth System Strengthening for Human Capital Development: Health systemWorld Bank
  • 44.7%Public debt, share of GDP, end of fiscal year 2025/26, up from 40% a year earlierIMF, August 2026

Capital already committed

  • MultilateralApprovedDigital Eswatini Project$65M

    Approved 15 June 2026 · Three World Bank commitments of $19.3M, $26M and $19.7M

    Broadband and digital public services

    A World Bank project to widen access to affordable broadband and to help the government deliver public services online. Digital access supports livelihood and the reach of education and health services.

    World Bank

    Source
  • MultilateralSignedFiscal Management and Competitiveness Development Policy Financing, OPEC Fund co-financing$50M

    Approved 29 July 2025 · Signed 16 January 2026 · Policy-based loan · Total programme $200M with the IBRD and the AfDB

    Co-finances the World Bank reform loan

    The OPEC Fund’s policy-based loan to the reform programme of the same name, co-financed with the IBRD and the African Development Bank and executed by the Ministry of Finance. The World Bank’s part of the programme is the $100 million development policy loan listed here.

    OPEC Fund for International DevelopmentWorld BankAfrican Development Bank

    Source
  • MultilateralApprovedFiscal Management and Competitiveness Development Policy Loan$100M

    Board approval announced 30 April 2025 · Development policy loan · First of a programmatic series of two

    Public debt, private sector and energy reforms

    Budget support for reforms to public debt management and spending arrears, the business climate and digital payments, and the opening of the electricity market to private renewable power. It builds on the 2021 to 2022 series and aims to mobilise private capital and expand energy access.

    World Bank

    Source
  • MultilateralApprovedAccelerating Sustainable and Clean Energy Access Transformation (ASCENT) Eswatini$100M

    Announced 13 February 2025 · $39M IDA, $51M IBRD, $10M Livable Planet Fund grant

    Electricity for 200,000 people

    Grid and off-grid electricity for 200,000 people, with 50,000 new household connections over five years, building on the Network Reinforcement and Access Project. It aims at the remaining 12% of citizens without electricity, the energy standard.

    World Bank

    Source
  • MultilateralSignedMkhondvo-Ngwavuma Water Augmentation Program, Phase 2$20M

    Approved 21 June 2023 · Signed 23 December 2024 · Project loan · Total cost $213.5M

    Dams and irrigation in the south

    The OPEC Fund’s loan to the second phase of the water augmentation programme, executed by ESWADE, with the Government, BADEA, the DBSA and the African Development Bank. Stored water for irrigated farming supports the food and livelihood standards.

    OPEC Fund for International DevelopmentBADEADBSAAfrican Development Bank

    Source
  • MultilateralActiveStrengthening Early Childhood Development and Basic Education Systems$32.1M

    Approved 2 May 2022 · Investment project financing

    Early years and basic schooling

    Supports early childhood development and basic education.

    World Bank

    Source
  • MultilateralActiveHealth System Strengthening for Human Capital Development$20M

    Approved 22 June 2020 · Investment project financing

    Health system

    Strengthens primary care and the health system.

    World Bank

    Source
  • MultilateralActiveWater Supply and Sanitation Access Project$53M

    Approved 10 October 2019 · Additional financing of $8M, 12 June 2025 · Investment project financing

    Rural water and sanitation

    Extends safe water and sanitation to underserved communities. The World Bank raised its financing from $45 million to $53 million in June 2025: the water standard sets Coverage in Eswatini.

    World Bank

    Source
  • MultilateralActiveNetwork Reinforcement and Access Project$40M

    Approved 27 June 2019 · Investment project financing

    Grid and new connections

    Strengthens the grid and connects new households.

    World Bank

    Source
  • RegionalApprovedEnhancing Economic Resilience and Competitiveness Program, Phase I$47.5M

    Announced July 2025 · Loan · First phase of a two-year programme

    Public finance and private-sector growth

    African Development Bank budget support for fiscal and public financial management reforms and for private-sector-led, inclusive and green growth. It aims to reduce domestic arrears, raise private-sector growth and increase the renewable share of energy, alongside World Bank financing.

    African Development Bank

    Source
  • RegionalApprovedRoad links in Lubombo and Shiselweni, first stage$140.6M

    Announced 9 December 2024 · Loan · 105.9 km of paved roads on the MR14 and MR21

    Climate-resilient roads in the east and south

    Upgrades 105.9 km of paved road on the MR14 (Siphofaneni to Nsoko) and the MR21 (Maloma to Siphambanweni), with bridges and an axle-load weighing station. It includes vocational training and apprenticeships for at least 200 young people in the Lubombo and Shiselweni regions.

    African Development Bank

    Source
  • RegionalGrantedNew Eco-Green City Masterplan, Shiselweni$400K

    Approved 8 June 2023 · Grant from the Urban and Municipal Development Fund

    Planning a new town for an agro-processing zone

    An African Development Bank grant to ESWADE for the vision, master plan and pre-feasibility studies of a new urban area in Shiselweni, linked to the Mkhondvo-Ngwavuma water programme and a planned agro-processing zone. It plans for housing, health and education services for the workers and families the zone would bring.

    African Development BankESWADE

    Source
  • PrivateFinancial closeLower Maguduza Hydropower Project, 13.5 MWR567M

    Financial close announced 3 February 2025 · Standard Bank mandated lead arranger

    Private hydropower for the national grid

    Debt financing for a 13.5 MW hydropower plant developed by African Clean Energy Developments, whose shareholders are the IDEAS Fund managed by AIIM and the Eswatini Public Service Pensions Fund. It adds a private renewable source of power, the energy standard.

    Standard BankAfrican Clean Energy DevelopmentsIDEAS Fund (AIIM)Public Service Pensions Fund

    Source

The Eswatini Newswire

The Solutions Wire
Lindiwe Simelane, Nation Steward of Eswatini

Lindiwe SimelaneNation Steward of Eswatini · SI Researcher

Already working in Eswatini.

Independent firms and social enterprises already at work in Eswatini, highlighted by Perfect Nations. None is a partner of Perfect Nations.

Suggest an enterprise
  • Health

    The Luke Commission

    Mobile and pop-up clinics that take care to rural communities, where three in four citizens live; its Matsapha Mobile Clinic for factory workers sees an average of 300 people a day.

    The Luke Commission
  • Livelihood

    Gone Rural

    A social enterprise whose model lets rural women earn an income by weaving from their homes, using Eswatini’s ancestral weaving techniques.

    VOA, 2024

03Solutions · The seven stars · Perfect Capita

Perfect Eswatini, star by star.

Perfect Capita is the yearly cost, per person, of lifting everyone above the Living Line in all seven basic living standards, set with Eswatini in its own prices.

How Perfect Capita works
Eswatini: the seven stars of the logo, one for each basic standard of living, rising from the cup; Food is the larger centre star. Each star carries the figure for Eswatini.WATER38.2%SHELTER60.8%ENERGY56FOOD38.3%EDUCATION67.6HEALTH72LIVELIHOOD41.7%
38.2%
Water · furthest from reachSafely managed drinking waterWHO/UNICEF, 2024

Tap a star for its figure and source.

The price of Perfect Eswatini

To be set with Eswatini, from its own figures and in its own prices: Perfect Capita times the people of Eswatini, each year.

Read more

Perfect Nations estimate, to be confirmed with Eswatini. Figures marked dated rest on surveys more than five years old; lenient measures are marked as such. The strict measures

Strict measures. Food: share not moderately or severely food insecure (FAO). Water: safely managed drinking water where measured; where it is not, basic water, marked as such. Shelter: the lower of safely managed sanitation and the share outside urban slums. Energy: the lower of electricity per person against 1,000 kWh and clean cooking. Education: the lower of children reading by the end of primary school and lower-secondary completion. Health: WHO service coverage index. Livelihood: share above the stricter of the national poverty line and the World Bank line for the nation’s income group. Each figure links to its source.

Solutions for Perfect Eswatini

  • Solution No. 10

    Safe Water, Proven Home by Home

    The nation that met its HIV targets early brings the same discipline to safe water at home.

    • 01The challengeAbout 776,000 Emaswati have no safely managed drinking water at home.
    • 02What Perfect Nations advisesEswatini should finance safe water at home the way it reached its HIV targets early: a results-based programme that releases funds for each verified household connection, built on the Mkhondvo-Ngwavuma water augmentation now under way. With super intelligence, every homestead can be mapped and its water tested by phone, so connections follow need and every tap is proven safe.

    ~776,000Emaswati without safely managed drinking water at home

    FromPreeti SinhaPresident and CEO, Perfect NationsRead the SolutionDiscuss this Solution
Eswatini in Bloom, nation portrait of Eswatini
Eswatini in BloomNation Portrait · Art of Nations
Perfect Nations® · Letters to the NationsEswatini

Dear Eswatini,

You have done something few nations have done: you turned back an epidemic. … Care reached almost everyone. Income has not.

“You proved that a small nation can reach everyone with care. Now reach everyone with a livelihood.”

Yours in design,Preeti SinhaPresident and CEO, Perfect NationsRead the full letter

Work with us · The ReDesign Studio

The Perfect Eswatini ReDesign Studio

One mission, three depths: the same four moves for Eswatini, taken as far toward market as you choose.

Read more

For the Government of Eswatini, its development partners and investors. Scope and fees are agreed in writing before any work begins.

  1. 01Identify the assets
  2. 02Estimate Perfect Capita
  3. 03Co-design the capital architecture
  4. 04Launch the instruments
  1. Mandate 013 hours

    The Nation Briefing

    A private session for the people who decide.

    You leave withThe gap, named and sized

    Read more
    1. 01The five sovereign assets on this page, walked through.
    2. 02Coverage of 38.2 and the Gap, explained.
    3. 03The instruments that could close the Gap, shortlisted.
    4. 04The path to market, outlined.
    Request a Nation Briefing
  2. Mandate 023 days

    The Blueprint Lab

    Your team and ours, working the blueprint together.

    You leave withThe structure, drawn

    Read more
    1. 01The ledger tested against your ministries’ own data.
    2. 02Each of the seven standards costed in Swazi prices.
    3. 03One financing structure, drawn with your team.
    4. 04A term sheet and the partners to approach.
    Plan a Blueprint Lab
  3. Mandate 03End to end

    The Sovereign Mandate

    Led personally by the President and CEO.

    You leave withA structure ready for market

    Read more
    1. 01A full sovereign asset ledger, valued and verified.
    2. 02Perfect Capita set and agreed with government, with a monitoring plan.
    3. 03The full structure: legal form, credit enhancement, guarantees and pricing.
    4. 04Taken to investors and development partners, through to close.
    Discuss a Sovereign Mandate

Co-design it with us

Where Emaswati and Co-designers design the nation they want to live in.

  • Writings

    Write Perfect Eswatini into being.

    Up to 1,500 words on your vision of Perfect Eswatini, published with your name.

    Submit your writing
  • Voices of Perfect Nations Launching soon

    The local leaders already building Perfect Eswatini.

    Great local leaders: honest, dedicated and committed to basic standards of living for all. Every guest answers one question: “What does Eswatini already own, and how could it pay for a decent life for every citizen?”

  • Co-designers

    Join the community.

    Everyone who shares a vision, a voice or an enterprise here becomes a Co-designer of Perfect Eswatini.

    Become a Co-designer

The Eswatini ReDesign Studio is open

Design Perfect Eswatini with us.

Share your vision, suggest a guest, or write to us: every message receives a personal reply.

Sources
  1. World Bank, World Development Indicators, accessed 12 October 2026: population 2025, urban share 2025, land in agriculture and forest 2024, electricity access 2024, renewable fresh water per person 2022, natural resource rents, renewable share of electricity output 2021.
  2. WHO UHC service coverage index, 2023 (WHO Global Health Observatory). WHO/UNICEF JMP basic drinking water (via World Bank). FAO prevalence of undernourishment (via World Bank). UN-Habitat urban slum share, 2022 (via World Bank). National poverty headcount, latest survey (via World Bank).
  3. WHO Regional Office for Africa, 12 September 2023: 94%, 97% and 96% against the 95-95-95 targets.
  4. World Bank project pages for each entry of Capital already committed, as linked. The World Bank projects database lists few approvals after 2024; newer operations may be missing.
Eswatini in Bloom, flag edition: the nation portrait of Eswatini painted with its flag
Eswatini in BloomNation Portrait, flag edition · Art of Nations
Scroll to Top